
Durian mock recall: trace every lot within 2 hours
A mock recall guide for durian orchards, packhouses and exporters: link farm, lot, QC, carton, container and buyer, and measure trace time, mass balance and recall readiness within 2 hours.
By the DurianTradeX team · Updated · Reading time 12 minPrimary keyword: durian mock recall
- Short answer: a good mock recall starts from a hypothetical lot or shipment, traces back to the orchards and QC evidence, and traces forward to cartons, pallets, containers and buyers, with quantities produced, in stock, shipped, on hold and lost all reconciling with each other.
- The 2-hour target in this article is an internal service level for measuring readiness, not a legal deadline. Thailand’s Department of Agriculture (DOA) announced on 25 June 2026 that it will carry out a trace-back investigation within 24 hours when a destination reports a problem.
- Don’t just measure whether the documents can be found. Measure trace time, lot linkage, quantity reconciliation, contact readiness and evidence completeness, so you can keep any hold or recall as narrow as possible and decide quickly.
The answer first: a mock recall tests the system, it isn’t just a file search
A mock recall simulates an incident without waiting for a real one, to prove that you can identify the products involved, contain the risk, contact trading partners and get evidence to decision-makers in time. Codex defines traceability as the ability to follow the movement of a food through stages of production, processing and distribution, and sets the principle of being able to trace one step back and one step forward. For export durian, a ready system has to link more than just an orchard name or a container number.
- Backward: container/carton → packing batch → inbound lot → farm/GAP.
- Forward: farm/inbound lot → batch → carton/pallet → container → buyer.
- Identify the scope affected and the scope you can prove is not involved.
- Show quantities in every status so they reconcile, not just a list of documents.
- Record the time, person, decision and evidence at every step.
Why rehearse before the peak season
At peak harvest the packhouse receives from many orchards, splits and combines lots, changes shifts, moves pallets and rushes to close containers. Links that look complete in normal operation can break at high volume. Rehearsing before the peak finds duplicate master data, unreadable handwritten codes and places where data rests with a single person.
Separate current requirements from internal targets
As of 20 August 2026, TAS 9070-2023 has been a mandatory standard since 10 July 2025. It requires collection centres and packhouses to check evidence of the growing source, check maturity and record receiving inspections. The 2-hour target is a management benchmark set by the organisation to be ready for an investigation or recall, not a claim of an international requirement.
Design codes so one event links to the next
Start by defining unique IDs and how the data relates. Don’t use the orchard name, driver name or date alone as the primary key, because they can repeat. Each event should create its own code and link to the previous one in a verifiable way, and links must never be changed retrospectively without an audit log.
- Farm ID and GAP number, with status and expiry on the date of purchase.
- Harvest/inbound lot, with harvest date, arrival time, weight and supplier.
- QC sample ID, with result, method, equipment and approver.
- Packing batch, with line, shift, grade, packaging and yield.
- Carton/pallet ID, with quantity and hold or released status.
- Shipment, container, seal, booking, buyer and export documents.
A key rule when lots are mixed
If a packing batch takes durian from several inbound lots, the system must store a many-to-many relationship and calculate the share or quantity actually used. Recording only the main lot makes the recall scope narrower than reality and can let related product slip through.
Choose scenarios that test real risks
Don’t pick the lot with the most complete data every time. Have the working group draw scenarios that reflect real business events, such as the destination finding a pest, an abnormal chemical or heavy metal result, a mismatched orchard number, mislabelled cartons or a buyer quality complaint. Then set a trigger time to start the clock.
- Scenario A: start from a container and seal number, and trace back to every orchard.
- Scenario B: start from a farm ID, and trace forward to every carton and buyer.
- Scenario C: start from an abnormal sample ID, and identify every batch released on that result.
- Scenario D: start from a carton QR code reported by a buyer, and check authenticity and shipment.
- Scenario E: the main system is down, so data must be recovered from backup and an offline pack.
Run at least some rounds as blind tests
The exercise controller should know the scenario, but the operations team shouldn’t know the lot in advance, so you measure real capability rather than a file prepared for the occasion. Label it clearly as a MOCK EXERCISE so trading partners and staff don’t think a real recall is under way.
Run minutes 0–120 with clear roles and decision gates
Appoint one incident commander, and separate the people who search data, assess risk, liaise with agencies, communicate with buyers and log the timeline. The goal is to deliver an initial evidence pack within 120 minutes, with a list of items not yet confirmed, rather than waiting for everything to be complete before reporting.
- 0–15 minutes: open the incident, confirm the trigger, identify the starting lot or shipment and freeze data edits.
- 15–45 minutes: trace back and forward, pulling farm, GAP, QC, batch, carton, pallet, container and buyer data.
- 45–75 minutes: run the mass balance, splitting released, in stock, in transit, delivered, on hold, waste and unknown.
- 75–100 minutes: assess the scope, prepare the contact list and draft hold, withdrawal and recall instructions for the exercise.
- 100–120 minutes: the commander reviews the evidence pack, records gaps and closes the exercise.
Human authority must be clear
AI or a dashboard can gather data and flag exceptions, but classifying the incident, notifying agencies, holding product, recalling and communicating externally must stay with the people responsible, as set out in the procedure.
Use mass balance to narrow the recall and its cost
FAO and WHO note that large tracking units make a system simpler, but may mean recalling more food when an incident happens. Durian packhouses should therefore set lot granularity to balance speed on the floor, then prove it with an equation comparing quantity received against quantity used, shipped, in stock, on hold and lost. If the totals don’t reconcile, the unknown portion must be treated as at risk until proven otherwise.
- Inbound kg = packed kg + reject/waste kg + approved process variance.
- Packed cartons = loaded + warehouse + on hold + rework + damaged.
- Every loaded pallet and carton must link to the one correct container and seal.
- Shipment quantity must match the packing list and the data the buyer received.
- Record conversion factors and the reasons for yield variance.
The business payoff
Granular lots and reconciled totals reduce over-recall, which destroys margin and trust. At the same time, lots mustn’t be so granular that staff can’t keep up with recording. The goal is the smallest recall scope the evidence supports, not the smallest scope that suits commercial interests.
Score the exercise the way management would
Don’t end the exercise with “passed” and no numbers. Build a scorecard for each scenario and compare trends between rounds. Every unknown field counts as a gap. Don’t fill in data afterwards and backdate the time.
- Trace time: minutes from trigger to the initial evidence pack.
- Backward and forward linkage completeness: links found against links expected.
- Quantity reconciliation: the share of quantity whose status is identified and reconciled.
- Contact readiness: buyers, carriers, agencies and approvers actually reachable.
- Evidence completeness: documents, photos, logs and test results that open and can be used.
- Unknown scope: cartons, kilograms and value not yet classified.
- CAPA closure: critical issues closed on time.
Example criteria for the first round
Set an internal SLA of trace time within 120 minutes, 100% linkage and quantity reconciliation, zero critical missing records and zero unknown scope. If you don’t reach the target yet, record the real baseline and close gaps round by round rather than declaring a pass without evidence.
Close gaps with CAPA and data governance
Every gap needs a root cause, corrective action, preventive action, owner and due date. The most common problems aren’t a missing system, but non-standard codes, multiple file versions, edit rights that are too broad and evidence sitting in private chats. Set up a central data system with version control, role-based access, an audit log, backup and retention in line with your organisation’s and market requirements.
- Lock master data for orchards, packhouses, buyers, carriers and product codes.
- Never delete or overwrite an original QC result; correct it with a revision and a reason.
- Record the timestamp and approver for every hold and release.
- Test backup recovery and the offline contact list.
- Use one evidence pack template across the organisation.
- Repeat the exercise after closing major CAPAs to confirm they work.
An AI opportunity with controlled risk
AI can catch mismatched lot numbers, find missing documents, summarise the farm-to-container trail and prioritise incidents by value or cut-off. But it must reference source data, show confidence and exceptions, and never create codes or test results that don’t exist. Releasing product and communicating a recall must always go through human review.
Checklist before declaring the system recall-ready
Readiness doesn’t come from software alone, but from data, process, people and testing working together. Have management sign off on the exercise results, the remaining risk and the CAPA plan, using evidence from real scenarios.
- A current recall procedure and list of authorised people are in place.
- You can trace one step back and one step forward.
- Every lot links to farm/GAP, QC, batch, carton/pallet and shipment.
- The mass balance reconciles, or the unknown portion is shown transparently.
- The contact tree has been tested and has a backup channel.
- The initial evidence pack can be produced within the internal SLA.
- CAPAs have due dates and a confirmation exercise after the fixes.
- The latest buyer and agency requirements are reviewed before real use.
Frequently asked questions
Does the law require a durian mock recall within 2 hours?
No. The 2-hour figure in this article is an internal service level for measuring an organisation’s readiness, not an international legal deadline. Check the latest Thai, destination, buyer and certification requirements separately.
Should a mock recall start from a lot or a container?
Alternate between both. Start from a container to prove you can trace back to every orchard, and from a farm or inbound lot to prove you can trace forward to every carton, container and buyer.
What is the minimum data needed for a durian trace-back investigation?
At least farm/GAP, harvest and receiving dates, inbound lot, QC sample and result, packing batch, carton/pallet, quantity and status, container/seal, shipment, buyer and an audit trail of holds and releases, depending on the scope of work and the requirements that apply.
What should we do if the mass balance doesn’t reconcile?
Separate the difference as unknown and treat it as within the risk scope for now. Never adjust figures to make the totals match. Open an incident to find the root cause, check receiving, yield, waste, rework, warehouse and loading, and record the fix with an audit trail.
How often should we rehearse a recall?
Base it on your risk assessment, certification standards, customer requirements and system changes. Rehearse again at the start of the season, when systems or people change, after a real incident or after closing a major CAPA, to confirm the fix works.
Can AI run a mock recall fully automatically?
AI can help find links, check inconsistencies, run a first mass balance and assemble the evidence pack, but a responsible person must confirm the data sources, assess the risk, approve any hold or recall and communicate with agencies and trading partners.
Official sources
Information last checked on 20 August 2026
- TAS 9070-2023: code of practice for inspecting and receiving durian at collection centres and packhouses (Thai)National Bureau of Agricultural Commodity and Food Standards (ACFS) · In force from 10 July 2025; checked 20 August 2026
- 4-layer PLUS screening measures for southern durian and trace-back investigations (Thai)Department of Agriculture, Thailand · Published 25 June 2026; checked 20 August 2026
- “4 No’s” measures to control quality and prevent origin substitution in export durian (Thai)Department of Agriculture, Thailand · Published 13 February 2026; checked 20 August 2026
- FAO/WHO Guide for Developing and Improving National Food Recall SystemsFAO and WHO · Published 2012; checked 20 August 2026
- Principles for Traceability/Product Tracing (CXG 60-2006)Codex Alimentarius Commission · Published 2006; checked 20 August 2026
- Quarantine requirements for fresh durian imported into China: orchards and packhouses must be registered (Chinese)General Administration of Customs of China (GACC) · Published 13 September 2023; checked 20 August 2026