An export documentation officer checks ePhyto and phytosanitary certificate data for a durian shipment before loading
EXPORT COMPLIANCE · PRACTICAL GUIDE

ePhyto for durian to China: control the data before you apply

A guide to controlling ePhyto data for durian exported to China so shipment, lot, cartons, weights, container and documents all agree before you apply, cutting certificate corrections, missed sailings and problems at destination.

By · Updated · Reading time 10 min
EXECUTIVE TAKEAWAYS

Primary keyword: ePhyto durian China

  • An ePhyto is an electronic phytosanitary certificate that carries the same information as the paper certificate in XML format and is prepared under the ISPM 12 framework.
  • Accurate filing starts from a single shipment master, not from copying data out of several invoices, packing lists, bookings and packhouse files.
  • Before requesting a certificate, pass a certificate gate that checks exporter, consignee, product, lot, quantity, weight, container, route and inspection results, and keep a revision every time something changes.
01

The short answer: what must line up on a durian ePhyto

Exporters should make sure the data in the phytosanitary certificate application matches the goods actually inspected and the whole shipment file: exporter, consignee, commodity and origin, number of packages, weights, marks, container, conveyance, point of entry and any declarations or treatments the authorities require. The IPPC describes the ePhyto as the electronic equivalent of a phytosanitary certificate in XML, with the same content as the paper version, prepared under ISPM 12. Thailand’s Department of Agriculture runs an e-Phyto system for businesses, but procedures, supporting documents, inspection booking and the formats accepted at destination can change, so check the official notices and portal before every shipment.

  • Use the shipment ID as the central key for the application and every document.
  • Pull data from approved master data.
  • Check the actual goods against cartons, pallets, lots and container before filing.
  • Assign a checker who is not the person filling in the application.
  • Record in the checklist the date you last checked the requirements.
02

An ePhyto is a certificate, not just an attachment

An ePhyto is not simply a PDF sent by email. It is structured phytosanitary certificate data exchanged between national plant protection organisations (NPPOs) through the relevant systems. The IPPC ePhyto Solution consists of the Hub, the GeNS system for countries that need it, and a data format that keeps the exchange consistent. In Thailand, businesses access the service through the Department of Agriculture portal. Even so, do not assume ePhyto makes every market paperless automatically: confirm current practice for Thailand, the trading partner, the border post and the document chain on the actual shipping date.

  • Certificate data must reflect the goods actually inspected and certified.
  • The electronic reference number must link to a single shipment.
  • Statuses such as draft, submitted, inspection, issued, replaced or cancelled must be clearly separate.
  • Printouts or copies should not be used in place of the official status without verification.
  • Define who may file, amend and receive results, by role.
03

Build a shipment master before starting the application

Many certificate errors do not start on the ePhyto screen but in separate source data: sales changes the consignee, the packhouse changes the carton count, logistics swaps the container and documentation still uses the old file. The control is a shipment master with data owners and approval status, from which the invoice, packing list, shipping instruction, certificate application and loading record all draw. Unconfirmed data must show as pending, never filled in with an estimate just to get the application out.

  • Exporter, consignee and notify party in the roles actually used.
  • Commodity, botanical name and product details as required.
  • Package type, carton count, net and gross weight and units.
  • Farm, packhouse, lot, pallet and package marks.
  • Container, seal, means of conveyance, point of entry and destination.
  • Inspection results, treatments and additional declarations where required.
04

Reconcile the data on three levels

Before filing, check consistency on three levels. Identity: legal entity names, consignee, orchard, packhouse and registration numbers. Quantity: cartons, weights, lots and pallets. Movement: container, seal, conveyance, exit and entry points and dates. Compare field by field with a system rather than reading whole files by eye. When there is a difference, state which document is the source of truth, who owns the data and which downstream documents must be regenerated. Never correct only the application while the packing list or loading record keeps the old value.

  • Identity match = 100% for critical fields.
  • Any quantity variance needs a reason and an approved tolerance.
  • A container or seal change must flow through every related document.
  • Keep units for kg, cartons, pallets and decimals consistent.
  • Lock data once the checker passes it, and open a revision for any change.
05

Connect the certificate gate to inspection and loading

A complete application does not mean the goods are ready to release. Link the certificate gate to inspection results, lot status and the loading gate in one workflow. Goods on QC pending or quality hold, with required test results outstanding or that cannot be traced to orchard and packhouse, must not be used to create an application ready for approval. When officials inspect, record the date and time, inspection point, shipment ID, goods and the evidence your policy allows. After loading, confirm actual quantities, container and seal again before closing the document set.

  • Pre-inspection: product list and evidence ready.
  • Inspection: the actual goods match the application and the lots.
  • Post-loading: quantity, container, seal and packing list agree.
  • Release: certificate status and conditional documents complete.
  • Gate-out: no critical exceptions outstanding.
06

Give additional declarations and treatments a clear owner

Additional declarations and treatment details are high-risk fields because they depend on the destination’s requirements, the commodity and the measures applied to that shipment. Never paste wording from an old certificate without checking the current version. Appoint a regulatory owner to check the official source, effective date, product scope and conditions before approving a template. Where there are test results or treatments, link the report number, method, date, location, provider and the lots covered, without reading the evidence beyond its scope.

  • Keep an approved text library with sources and review dates.
  • Expired templates must be blocked automatically.
  • A test report is valid only for the coverage it states.
  • Any override needs a reason and a specialist’s approval.
  • AI may compare wording, but must never approve requirements in place of a person.
07

Correct certificates through revisions, never by overwriting

When the consignee, quantity, container, conveyance or other key data changes after filing, assess the impact on the application, the certificate and every other document. The original status must stay in the audit trail with the reason, requester, checker, approver and time. If a replacement or cancellation is needed, follow the procedures of the Department of Agriculture and the destination country in force at the time, and inform the packhouse, logistics, customs broker, buyer and others from the same incident. Sending a new file in a chat without withdrawing or identifying the old one is how wrong documents end up being used at destination.

  • Never use file names like final-final as version control.
  • Use a unique certificate ID and revision number.
  • Show superseded-by and replaces links so the relationship is visible.
  • Revoke download access to unused versions where the system allows.
  • Check receipts or acknowledgements from document recipients.
08

A 48-hour plan before cut-off, and KPIs

Work backwards from the real cut-off of each shipment rather than using one SLA for every border post or season. First confirm master data, registration status and requirements. Next, freeze the lots to be shipped and prepare for inspection. Finally, reconcile actual quantities, container, seal and certificate status, with a buffer for exceptions. Management should see a certificate readiness board that shows only containers at risk, mismatched documents, pending results and time remaining, instead of chasing status from each team.

  • Applications passed by the checker before the inspection appointment = 100%.
  • Critical field mismatches before filing = 0.
  • Certificates corrected because of internal data errors = 0.
  • Certificate–packing list–loading record match = 100%.
  • Shipments gated out before the required ready status = 0.
  • Time to close exceptions against cut-off, and containers at risk of missing the vessel.
FAQ · Quick answers

Frequently asked questions

What is an ePhyto for durian exported to China?

It is an electronic phytosanitary certificate for a shipment of plant products, with structured data equivalent to the paper certificate under ISPM 12. Thai exporters must use the channels and procedures the Department of Agriculture sets for the actual market and shipment.

Does ePhyto replace all other durian export documents?

No. It does not replace the invoice, packing list, shipping instruction, certificate of origin, test results or other evidence the transaction requires, but key data across those documents must agree and refer to the same shipment.

Which data should be double-checked before filing an ePhyto?

Exporter and consignee, product description and botanical name, origin, number of packages, weights, marks, lot, orchard, packhouse, container, seal, conveyance, point of entry, inspection results and any additional declarations required.

What if the carton count or container changes after filing?

Hold the release of documents, assess the impact and correct through a revision, replacement or cancellation under the official procedure that applies. Never change only the packing list or send a new version without dealing with the status of the old one.

Does ePhyto remove the need for paper in every case?

Do not assume so. Acceptance of electronic formats, printed copies and fallback procedures can differ by country, border post and period. Check the Department of Agriculture portal and the latest guidance for the destination.

How can AI help check ePhyto applications safely?

AI can compare names, quantities, weights, container numbers and wording across documents, catch empty fields and prioritise exceptions. The responsible person must still check official sources, confirm the coverage of test results and approve the application or any certificate correction.

Read next and put it to work

Document control for durian exportsHow to export durian to China: from orchard to port of entryDurian container VGM: check weight, seal and lot before sailingGet a durian packhouse ready for audits and China exportBY2 and cadmium testing for durian: control every sample up to container release

Official sources

Information last checked on 15 August 2026

  1. Electronic phytosanitary certificate system for businesses (Thai)Department of Agriculture, Thailand · Last checked 15 August 2026
  2. Department of Agriculture notice on phytosanitary certificates for fruit exported to China, 2021 (Thai)Department of Agriculture, Thailand · Published online 17 October 2023
  3. Launch and expansion of the ePhyto phytosanitary certificate (Thai)Department of Agriculture, Thailand · 3 May 2022
  4. IPPC ePhyto SolutionInternational Plant Protection Convention (IPPC) · Page updated October 2025 · checked 15 August 2026
  5. ISPM 12: Phytosanitary certificatesInternational Plant Protection Convention (IPPC) · Revised edition published 7 April 2023
  6. IPPC ePhyto Solution: March 2026 programme updateInternational Plant Protection Convention (IPPC) · 6 March 2026
All articlesTry the platform