An export team tracks the free-time clock on a durian reefer and plans its return before demurrage and detention start
CONTAINER PROFITABILITY · PRACTICAL GUIDE

Durian container free time: prevent D&D before it eats your margin

A guide to controlling free time on durian containers: separate demurrage, detention and storage, run a cost clock per container, buy extra days on the numbers and close the evidence before margin disappears.

By · Updated · Reading time 13 min
EXECUTIVE TAKEAWAYS

Primary keyword: durian container free time

  • Short answer: open One Container, One Cost Clock from empty pickup to container return. Record the events that start and stop free time, the free days, how days are counted, the tier rates, the owner and the carrier or terminal evidence for each booking, and alert at least two levels before time runs out. Never default a new job to the free days of an old shipment.
  • Demurrage, detention, combined D&D and storage are not always the same thing. Under the Maersk terms we checked on 2 September 2026, demurrage covers time a carrier’s container spends inside the terminal, port or depot beyond free time, detention covers time outside, and storage may be a separate charge for space depending on the country. Each carrier, location, equipment type and contract may define events and calculations differently.
  • This article gives no blanket free days or rates, because Hapag-Lloyd Thailand’s pages and carrier tools confirm you must check by booking or container and the current tariff. Reefers may also carry plug-in, monitoring, electricity, genset or terminal charges separate from D&D, so put every clock into the container margin before deciding to buy additional free time.
01

The answer first: open One Container, One Cost Clock at booking

An organisation that only learns about free time when the invoice arrives fixes things too late. The cost clock must be created with the shipment ID and container number, based on the booking confirmation, the contract or tariff and the latest portal data, not a table remembered from earlier jobs. Then the origin and destination owners must see the same deadline with the next action.

  • Tie booking number, container number, equipment type, origin, destination and carrier into one record.
  • Record clearly whether D&D is separate or combined, because the start and stop points and use of free days differ.
  • Store the number of free days with the definition of calendar or working day and the excluded holidays.
  • Record the start event, stop event, timestamp, time zone and evidence source every time.
  • Enter tier rates, currency, tax and parallel charges without copying figures across carriers.
  • Assign the cost owner, operational owner and approver for buying extra days as separate roles according to risk.
  • Set alerts at T-72, T-48 and T-24 hours, or whatever suits the route, with escalation when an event doesn’t happen.

Free time is a contractual right, not a general free holiday

Maersk defines free time as the period agreed between the carrier and the merchant during which the related demurrage, detention, combined D&D or storage is not yet payable. Read the contract or booking and the local terms; don’t interpret “free days” without knowing which activity they apply to.

Running out of free time doesn’t mean the fruit has spoiled

D&D is a clock for equipment and space use, not a measure of temperature or durian condition. Keep it separate from cold-chain alarms, plug-in status, power interruptions and quality holds, even though the same event can push up both time cost and quality risk.

02

Separate 4 cost clocks so the team uses the same words

Mistakes start when shipping, the buyer and accounting use “D&D” for every charge. Build a data dictionary from the carrier’s terms and separate at least four groups before calculating.

  • Demurrage: mainly the time a carrier container stays in the terminal, port or depot beyond free time, but follow the events in the actual contract.
  • Detention: mainly the time a carrier container stays outside until the empty is returned, beyond free time.
  • Combined D&D: inside and outside periods share one pool, so free days used in one phase reduce what is left for the other.
  • Storage: space charges from the port, terminal or depot, which may be included in or separate from the carrier charge depending on country and provider.
  • Reefer service charges: plug-in, electricity, monitoring and handling may run on different clocks and need their own tariff check.
  • Other exposure: truck waiting, yard, customs inspection, amendments, late payment and the opportunity cost of delayed durian.

Example event map on the export side

The export detention clock may start at empty gate-out and stop at full gate-in, while export demurrage may cover full gate-in to loaded on board under some carriers’ terms. Picking up the container earlier than needed, or gating in early when the vessel is delayed, can use up free days without creating any value.

Example event map on the import side

Import demurrage usually covers discharge to full gate-out, and detention covers full gate-out to empty gate-in, but combined rules, inland depots and availability events can change the details. Check the booking’s system and record actual timestamps; don’t guess from the ETA.

03

Lock 12 fields before confirming the booking and the sales price

Before confirming price and Incoterms, commercial and logistics should close 12 data gaps. If any field has no evidence, record it as an assumption with an owner and a confirmation date; don’t hide the cost inside the overall margin.

  • 1 Carrier, service, contract or rate reference
  • 2 Origin, POL, POD, final destination and empty depot
  • 3 Equipment: 20 or 40, reefer or special, and ownership
  • 4 Separate or combined D&D
  • 5 Export free time and import free time, by activity
  • 6 How days are counted: calendar or working day, holidays and partial days
  • 7 Start and stop events for every clock
  • 8 Daily tier rates, currency, VAT or tax and the exchange-rate rule
  • 9 Storage, plug-in, electricity, monitoring and handling charged separately
  • 10 Incoterms, named place and contractual responsibility
  • 11 ETA buffer, customs, inspection, buyer appointment and empty-return plan
  • 12 Channels for checking charges, buying extra days and filing disputes, and the evidence needed

Incoterms don’t make the carrier’s invoice disappear

Incoterms divide duties and risk between seller and buyer, but the carrier may bill its contracting party under the contract of carriage first. Finance must know both the billing party and the ultimate cost owner, and the recharge or claim mechanism in the sales contract.

Reefers need their own rate card

Never apply dry-container free time or tier rates to reefers. The Hapag-Lloyd Thailand page we checked on 2 September 2026 clearly shows reefer import free time and rates separate from dry and special equipment, but those figures are specific to that area and service and may change. Don’t apply them directly to China or other carriers.

04

Manage the origin side: don’t pick up early or return late

Exporters often focus on the CY cut-off, but value depends on the whole stretch from empty pickup to loaded on board. Picking up early for buffer while the fruit isn’t ready can start detention, and gating in too early when the vessel is delayed can add demurrage, storage or plug-in exposure.

  • Confirm the earliest pickup against production-ready time and PTI capacity before sending a truck.
  • Issue pickup approval when fruit, cartons, labour, documents and slot meet the criteria.
  • Record empty gate-out from the EIR or carrier event, not the time someone phoned in.
  • Compare loading finish, seal applied, full gate-in, CY cut-off and actual loaded on board.
  • When the vessel is delayed, weigh holding at the packhouse against gating in early, on both cost and cold-chain risk.
  • If a container is rejected or swapped, close the old clock and open an exception for the new container; never overwrite the container number.
  • Have operations post actual events to the container margin within the same day, not wait for the invoice.

Don’t buy buffer just by picking up early

Good buffer comes from PTI slots, truck capacity, the loading plan and clear decision deadlines. Picking up further ahead may simply move the risk from the cut-off to detention and tie up reefer equipment longer.

05

Manage the destination side from ETA to empty return

The destination needs an owner before the vessel sails, not when the arrival notice comes, because release, customs, inspection, payment, truck slots, warehouse appointments and the empty depot can all move the last day. Have the buyer or consignee update plan against actual daily and share exceptions with the seller under the contract.

  • T-7 to T-3: check ETA, arrival notice, original or eBL release, payment and permit readiness.
  • T-3 to T-1: confirm customs and broker, inspection risk, terminal release, truck and warehouse slot.
  • Discharge or availability day: record the real event and recalculate the last free day from the rule.
  • Before full gate-out: confirm power, tractor, route and appointment so the problem doesn’t just move to detention.
  • After delivery: plan the empty-return depot, opening hours and appointment, and keep the return EIR.
  • If the depot is closed or rejects the container: get evidence of time and place, a screenshot or notice and the carrier’s instruction immediately.
  • Close the shipment when empty gate-in is confirmed and pending charges are zero or have a dispute owner.

ETA is not always the start event

Some clocks start at discharge, availability, depot gate-in or an event defined in the contract. Using ETA plus free days can give the wrong deadline. Use real timestamps and state the time zone.

06

Buy additional free time on break-even, not gut feel

Hapag-Lloyd Thailand lists a channel for buying additional free time, and Maersk shows free time and charges at container level in its system. Exporters should decide before booking, or before the carrier’s pricing window, by comparing expected loss, not by buying the same for every container.

  • Forecast the return date at P50, P80 and P95 from route, port, buyer and season history.
  • Calculate expected D&D as the sum of probability of delay × tier cost for each period.
  • Add storage, reefer services, truck waiting and the fruit’s opportunity cost to the scenario.
  • Compare the premium for extra days with the expected avoidable cost and cash-flow impact.
  • Buy only for shipments where the risk-adjusted saving exceeds the premium by your set margin of safety.
  • Record the quotation, terms, purchase cut-off, actual extra days and approval with the booking.
  • After the job, compare paid extra days with days used to adjust policy; don’t judge from one container.

A short formula for the control tower

Projected exposure = Σ(days over in each tier × tier rate) + storage + reefer services + truck and yard − confirmed credits or waivers. The decision value of additional free time must be compared with the risk it avoids, excluding costs that will happen whether you buy or not.

Don’t count an unapproved waiver as zero

While a waiver is being requested, show gross exposure and probability-adjusted recovery separately until you receive a credit note or written confirmation. Otherwise the container margin may look better than it really is.

07

Check invoices and file disputes from event evidence

When an invoice arrives, check the contract or tariff version, billable party, container, activity period, free days, tiers and event timestamps. Don’t dispute only by saying the vessel was late or the queue was long; show the timeline and evidence of when the container or space was not available.

  • Match each invoice line to booking, container, charge type, currency and tax.
  • Recalculate from start and stop events with the rule in force, not an unversioned spreadsheet.
  • Check holidays, working days, partial days, combined pools and tier transitions.
  • Attach EIRs, terminal and carrier events, arrival and release notices, depot rejections and communication timestamps.
  • Separate a commercial request for a waiver from a billing-error dispute.
  • Record the deadline, case reference, owner, amount disputed, provision and resolution.
  • Where the route involves the United States, check the latest FMC framework with a specialist, because its billing and dispute rules have a specific scope and are not international law.
  • Close the cost record when the invoice or credit note matches, and feed the root cause back into booking and operations.

FMC can serve as a benchmark, but don’t generalise it to every route

The 2024 FMC rule sets certain information and time frames for D&D invoices under US law, and the FMC implementation page explains that its scope reaches some invoices from non-US entities when they are common carriers as defined. Thai exporters shipping to China shouldn’t automatically claim these rights if the shipment is outside that scope.

08

Build a free time control board and run a 30-day pilot

A good board answers instantly which container has how many days left, what the next event is, how much exposure there is and who must act, without hiding ETA or availability uncertainty behind a green light.

  • Days 1–5: build the data dictionary and event map, separating export, import, combined, storage and reefer.
  • Days 6–10: take bookings and tariffs for 10–20 containers as a baseline and check evidence completeness.
  • Days 11–15: switch on alerts, escalation, a last-free-day calculator and RAG status calculated from real events.
  • Days 16–20: connect buyer, broker, truck and depot data and test vessel delays, inspections and depot rejections.
  • Days 21–25: add forecasting and the buy-more-free-time decision, still with human approval.
  • Days 26–30: reconcile invoices and credit notes with the clocks and approve the SOP, roles and retention.
  • KPIs: % of containers with free time verified before booking, forecast error, containers over free time, D&D per kg and per container, avoidable cost, dispute recovery and on-time proof of empty return.
  • Next step: use DurianTradeX to bring bookings, cut-offs, container events, evidence and container P&L into one control tower.

Red must translate into action

Every alert needs a next action, deadline, owner and escalation path, such as complete release, secure a truck, book inspection, change depot, buy extra days or open a dispute. A board that only shows a day count with no action becomes a backward-looking dashboard.

FAQ · Quick answers

Frequently asked questions

What is the difference between demurrage and detention?

Broadly, demurrage covers a carrier container staying in the terminal, port or depot beyond free time, while detention covers a container staying outside until the empty is returned beyond free time. Some bookings use combined D&D, so follow the definitions and events in the actual contract or tariff.

How many days of free time does a durian container get?

There is no single number for every container. It depends on the carrier, contract, country, terminal, equipment, separate or combined rule and the shipment. Carriers themselves recommend checking booking- or container-level data and the current local tariff.

Is storage always included in demurrage?

Not always. Maersk says storage is a charge for using port, terminal or depot space, and whether it is billed separately or together depends on the country. Check both the carrier invoice and the port or terminal tariff.

Do reefers get the same free time as dry containers?

Never assume so. Hapag-Lloyd Thailand shows reefer free time and tiers separate from dry in some contexts, and reefers may add plug-in, electricity or monitoring charges. Check the rate card for the actual equipment and location.

Should we buy additional free time for every container?

Not across the board. Compare the premium with expected D&D, storage and reefer exposure based on the probability of delay by route, buyer and season, then record used against purchased days to adjust your policy.

If the vessel was delayed, shouldn’t we avoid demurrage or detention?

You can’t conclude that from the delay alone. Look at the charge type, start and stop events, equipment availability, the contract or tariff and when the container or space was actually usable. If you disagree, keep the timeline and evidence and use the billing party’s dispute process.

How can AI help control free time?

AI can forecast return dates, prioritise alerts, read invoices and spot event anomalies. But rates and rules must come from approved documents, and buying extra days, accepting invoices and filing disputes need human approval and an audit trail.

Read next and put it to work

Container profitability: see the margin on every durian container before you close the shipmentDurian container cut-offs: control SI, VGM and CY so you don’t miss the vesselFOB or FCA for durian containers: choose Incoterms that don’t leak costDurian reefer claims and the evidence pack

Official sources

Information last checked on 2 September 2026

  1. Terms for Detention and Demurrage: definitions and application periodsA.P. Moller–Maersk · Checked 2 September 2026
  2. Check Demurrage & Detention Freetime at container levelA.P. Moller–Maersk · Checked 2 September 2026
  3. Detention and Demurrage CalculatorHapag-Lloyd · Checked 2 September 2026
  4. Thailand FAQ: free time, tariff and additional free timeHapag-Lloyd · Checked 2 September 2026
  5. Thailand Import: reefer, dry and special equipment free-time exampleHapag-Lloyd · Checked 2 September 2026; an area-specific example, not a universal rate
  6. Storage charges for import containers (Thai)Port Authority of Thailand · Checked 2 September 2026
  7. Final Rule on Detention and Demurrage Billing PracticesU.S. Federal Maritime Commission · 23 February 2024; checked 2 September 2026
  8. Ocean Shipping Reform Act Implementation: scope of billing requirementsU.S. Federal Maritime Commission · Checked 2 September 2026
All articlesTry the platform