
QUALITY · PRACTICAL GUIDE
Durian QC and dry matter control by lot
Turn quality results into an approval gate backed by evidence that can be audited later.
By the DurianTradeX team · Updated · Reading time 7 min- Define the sampling plan and test method clearly.
- Attach photos, samples and the inspector to each lot.
- Use a quality hold when data is incomplete or out of specification.
Data standards matter more than the screen
Define units, sampling method, equipment, inspector and acceptance criteria in one data dictionary, so results from different shifts and buying points can be compared.
A quality gate before approval
A lot shouldn’t move to accepted while QC is still pending, on hold or failed. Overrides must be restricted, state a reason and be recorded in the audit trail.
Use QC data to reduce losses
Link QC results to yield, waste, complaints and selling prices to find patterns by orchard, season and variety, then use them to adjust purchasing plans and supplier development.