Mass balance and yield: the numbers that drive durian packhouse profit

How to link inbound weight, output, waste and losses so they can be checked batch by batch.

By · Updated · Reading time 6 min
EXECUTIVE TAKEAWAYS
  • Close a batch only when the mass balance is within tolerance.
  • Classify waste by reason.
  • Analyse yield by orchard and grade.
01

The basic control formula

Inbound weight must reconcile with output, waste, work in progress and the set tolerance. If the difference exceeds the limit, the system should stop the batch from closing and have the person responsible investigate.

02

Classify losses in a meaningful way

Separate reject, trim, moisture and handling loss, damage and unexplained variance so the team can fix each cause directly, rather than lumping everything into one waste figure.

03

Link yield to decisions

Compare yield by orchard, variety, fruit age, grade, production team and time period to adjust prices, plan capacity and build the supplier scorecard.