Durian shipping instructions: control 18 points before the SI cut-off
How to control durian export shipping instructions with an 18-point SI control sheet, matching the booking, invoice, packing list, export declaration, container and seal, and draft B/L before the cut-off.
By the DurianTradeX team · Updated · Reading time 15 minPrimary keyword: durian export shipping instructions
- Short answer: shipping instructions (SI) are the data set the exporter or its agent sends the carrier to produce the transport document or bill of lading. Build them from the shipment master and actual packed quantities, not by copying the last container’s SI and changing only the booking number.
- Use an 18-point SI control sheet to match the booking, contract or PO, commercial invoice, packing list, export declaration, container and seal, and VGM before you submit. Then check the carrier’s response and the draft B/L again, because a successful submission doesn’t mean the data has been fully confirmed.
- SI cut-offs and mandatory fields vary by carrier, vessel, destination and shipment. Rely on the booking confirmation and the portal for the actual job on the day you submit, not on times, fields or fees from a previous container as a permanent standard.
The answer first: the SI bridges the booking and the B/L
DCSA Bill of Lading 3.0 describes shipping instructions as data that builds on the booking request and booking confirmation, adding the parties, cargo details, volume, weight and other instructions that become the primary source for the transport document. Maersk and Hapag-Lloyd describe it the same way: the exporter, shipper or agent sends the SI to the carrier so it can issue the bill of lading. So the SI isn’t the booking, isn’t the draft B/L and isn’t the customs declaration, but the key data in each must stay linked in a controlled way.
- The booking confirms the transport plan: equipment, route, service and the conditions the carrier accepted.
- The shipping instructions send the parties, cargo, packages, weight, freight and document instructions.
- The draft transport document or B/L is what the carrier produces from the data it received, and it needs a second check.
- The customs declaration is what you declare to customs under government rules and workflows.
- The shipment master links the reference, version, source and status of all four layers.
Submitting the SI doesn’t mean the draft B/L is right
In the DCSA use cases, a submission puts the SI into RECEIVED status before the carrier processes it further, and there are separate states for requesting an update, confirming an update or declining one. Your team should keep the submission evidence, the carrier acknowledgement, any request for update and the draft B/L, rather than treating a screenshot that says “Submitted” as proof the job is closed.
Build an 18-point SI control sheet before you submit
The list below is an internal control template so the team can see the source, owner, checker, status and revision of each field. It doesn’t claim every carrier or country uses identical fields. Maersk lists basics such as shipment, container, package, gross weight, payment term, cargo description, shipper and consignee, plus any local data required by law, and each carrier’s portal may ask for more.
- 1 Shipment ID, SI reference, booking number, carrier, and Draft, Submitted or Received status.
- 2 SI cut-off with date, time, time zone and its source in the booking or portal.
- 3 Shipper legal name, address, registration reference and the text shown on documents.
- 4 Consignee legal name, address, contact, and “to order” terms when actually used.
- 5 Notify party and any additional notify, with their role and contact details.
- 6 Document type, number of originals and copies, and release instruction as actually agreed.
- 7 Place of receipt, port of loading, port of discharge and place of delivery.
- 8 Vessel, voyage and routing reference, marked Confirmed or Pending.
- 9 Marks and numbers, or a “no marks” instruction under the carrier’s rules.
- 10 Approved cargo description, language, product type, and variety or grade where needed.
- 11 HS reference, confirmed by the person responsible for classification rather than guessed by the system.
- 12 Total packages, kind of packages, the pallet-to-carton relationship and units.
- 13 Net weight, cargo gross weight, measurement and unit conversions.
- 14 Container number, equipment type and number of containers.
- 15 Seal number, sourced from the container-closing event and photo evidence.
- 16 Freight term, prepaid or collect, payer and charge display instruction.
- 17 Required references such as invoice, PO, certificate, customs or buyer reference.
- 18 Preparer, checker, approver, submit timestamp, response, amendments and closure evidence.
Separate required, conditional and optional fields
Don’t assume every field a portal opens is mandatory, or that optional fields have no business effect. Build a data dictionary that names the requirement source for each field, such as the carrier, local regulation, contract, L/C or internal control, with an effective date. Then the team knows which fields block submission, which become required when a condition applies, and which are only a convenience.
Run a seven-way match before you press Submit
A good SI comes from real data held by several parties, without forcing every document to use identical wording for no reason. Set field-level rules for which values must match exactly, which can be converted between units, and which may differ with a reason and an approver. Then show source, SI value, difference and decision on one review screen.
- Contract or PO ↔ SI: buyer, consignee, destination, product and commercial reference.
- Booking confirmation ↔ SI: carrier, route, locations, vessel or voyage and equipment.
- Commercial invoice ↔ SI: parties, product description, quantity and references actually used.
- Packing list ↔ SI: packages, cartons, weight, measurement and loaded quantity.
- Customs declaration ↔ SI: exporter, consignee, product, port, vessel and container context.
- Stuffing record ↔ SI: actual container, seal, package count and closing time.
- VGM record ↔ SI or carrier channel: verified gross mass value, method, signatory and submission status.
Don’t mix up cargo gross weight and VGM
IMO explains that the VGM of a packed container comes from weighing the packed container, or from adding the mass of the cargo, packaging, pallets, securing material and the container tare by a legally approved method. So don’t copy the cargo gross weight from the SI into the VGM automatically. Keep the definition, method, unit, source and certifying person separate.
Control parties and addresses as master data
Shipper, consignee and notify party names are often copied from emails or old files, even though a single wrong character can affect the transport document, the bank, customs or release at destination. Build a party master with legal name, display name, address version, registration or tax reference, contact, role and effective date, and link it to the contract and the shipment.
- Don’t retype a counterparty name when an approved master exists. Select it by counterparty code.
- Separate bill-to, buyer, consignee, notify party and freight payer, because they may be different legal entities.
- Set address formatting rules for documents without changing the meaning of the legal identity.
- Check “to order”, bank consignee or letter of credit instructions with trade finance before using them.
- Any party change after submission needs a change request and an impact check on every document.
Build the cargo description, packages and marks from the real goods
Hapag-Lloyd notes that an SI usually includes the consignee and notify party, cargo details, weight, volume, dimensions, packaging, customs data and special handling, and Maersk treats Cargo & VGM as its own step in the portal. These details should come from the product master and actual packing, not from marketing names that don’t reflect what’s in the container.
- Set an approved cargo description and the terms to avoid under buyer, bank or carrier requirements.
- Link lot, carton, pallet and container so the package count can be traced back to its source.
- Use marks and numbers that match the actual shipment. Maersk lists this as an optional field in its system.
- When there are several grades or lots, set a rule for combining lines that doesn’t break traceability.
- Check total packages, weight and measurement with formulas, not just by looking at a PDF.
Manage the SI cut-off with a latest safe start
Maersk says the deadline depends on the vessel and destination and points to the time in the booking confirmation, while Hapag-Lloyd says deadlines vary by carrier and shipment type. So your dashboard should read the cut-off from the source for the actual job, with its time zone, and work back to a latest safe start for actual packing, container and seal, document review and approval.
- Store the source URL or document, the time it was retrieved and who confirmed the cut-off.
- Keep the SI, VGM, CY or gate-in, cargo and customs cut-offs separate rather than merging them into one time.
- Set an internal SLA with a buffer for carrier requests for update and draft B/L review.
- When the vessel, voyage, port or booking changes, refresh every cut-off.
- Base warning colours on time remaining and readiness, not on the date alone.
Every time in the SI tracker needs a time zone
The team in Thailand, an overseas buyer and the carrier portal may show times differently. Store timestamps with an offset and display the local time each user understands. Block times from being copied without a zone, especially on shipments with transshipment or where the documentation team sits in another country.
Design states and evidence from submission to draft B/L
DCSA separates the use cases for submitting an SI, requesting an update, submitting an updated SI, carrier processing, publishing the draft transport document, shipper approval and carrier issue of the transport document. Your internal design should use verifiable states instead of a single Done box.
- Draft: the team is still collecting data and the SI must not be sent.
- Ready for approval: critical fields have passed the seven-way match and the evidence is complete.
- Submitted: sent from the system but still waiting for a response.
- Received or acknowledged: the carrier has the data, based on evidence you can verify.
- Pending update, update received, confirmed or declined: keep each request and the result of each revision separate.
- Draft B/L published: the carrier has issued a draft for review. It isn’t the final document.
- Approved or issued: an authorised person approves the draft and the carrier issues the chosen document type.
Amend the SI with an impact matrix, never by overwriting
DCSA notes that some changes, such as the seal number, go through a shipping instructions update, but certain reefer attributes must be changed in the booking process, and the carrier may confirm or decline an update. Before amending, classify whether the value is booking data, SI data, draft document data or issued document data, and follow the carrier’s workflow for the actual status.
- Record the old value, new value, reason, requester, timestamp and related reference.
- Check the effect on the booking, invoice, packing list, export declaration, VGM, certificates, B/L and buyer advice.
- Work out the effect on cut-offs, amendment charges and the risk of missing the vessel using current carrier data.
- Keep the carrier’s response and the draft or document revision that reflects the corrected value.
- Don’t close the exception when the request is sent. Close it when every affected system and document matches.
Use AI to check the SI, but let people approve and submit
AI is useful for pulling data from the booking, invoice, packing list and stuffing records and comparing it field by field with the SI draft. But parties, document type, HS, freight term, release instruction and amendments can have contractual, legal or financial effects. So show the source and confidence, and have the responsible person approve before every submission.
- OCR and extraction keep the source file, page, snippet, confidence and file hash.
- A rules engine checks exact matches, required and conditional rules, arithmetic and unit conversions.
- AI ranks exceptions by impact × urgency × data confidence.
- Never auto-fill missing values from a previous container, and never auto-submit or auto-amend.
- Keep the model and version, suggestion, human correction and final decision in the audit log.
- Measure false negatives, because wrong data the system didn’t flag is riskier than a high alert count.
KPIs and a 7-day rollout plan
Start with one closed shipment and one container in progress. The aim is to prove the SI control sheet, seven-way match, states and evidence pack before scaling up. Measure accuracy, speed and avoidable cost, not just how many SIs were sent on time.
- Day 1: collect the SI, booking, draft B/L and actual documents for the sample containers.
- Day 2: build the 18-point data dictionary with source, owner and rule.
- Day 3: set up the party and product masters and the seven-way match.
- Day 4: build the SI cut-off clock with time zones and a latest safe start.
- Day 5: simulate a seal change, short packing and a vessel or voyage change.
- Day 6: pilot AI or OCR on exceptions only, with human approval.
- Day 7: review with documentation, logistics, finance and compliance, then lock the SOP.
- KPI: first-pass SI acceptance and first-pass draft B/L approval.
- KPI: post-submission amendments, critical mismatches and missed SI cut-offs.
- KPI: review minutes per shipment, exception closure time and amendment cost avoided.
Frequently asked questions
What are shipping instructions for a durian export?
Shipping instructions (SI) are the data set the exporter, shipper or agent sends the carrier to produce the transport document or bill of lading. They usually cover the parties, cargo, packaging, weight, containers and document instructions, but the final fields must be checked against the carrier and the actual shipment.
How do shipping instructions differ from the booking and the draft B/L?
The booking requests and confirms the transport plan. The SI adds the final data the carrier uses to produce documents. The draft B/L is the draft the carrier publishes back for review. So submitting the SI isn’t the same as approving the draft B/L, and you need to control the reference and revision of each layer separately.
When must the SI be submitted?
There isn’t one time that applies to every job. Maersk says the deadline depends on the vessel and destination and points to the booking confirmation, and Hapag-Lloyd says it varies by carrier and shipment type. Rely on the current booking or portal, record the time zone, and leave time to review the carrier’s response and the draft B/L.
What should we do if the container or seal changes after the SI is sent?
Open a change request and stop using the old value. Check the impact on the SI, draft or final B/L, booking, packing list, export declaration, VGM and certificates, then send the update through the carrier’s workflow. Keep the confirmation and close the exception only when every document reflects the approved value.
Can AI prepare shipping instructions automatically?
AI can read documents, fill in a draft and flag mismatches, but it shouldn’t decide parties, HS, freight term or release instruction, or submit and amend on its own. Show the source and confidence, and have an authorised person review and approve every time.
Official sources
Information last checked on 14 September 2026
- Bill of Lading 3.0 — IntroductionDigital Container Shipping Association (DCSA) · Checked 14 September 2026
- Bill of Lading 3.0 — Use CasesDigital Container Shipping Association (DCSA) · Checked 14 September 2026
- Bill of Lading 3.0 — User StoriesDigital Container Shipping Association (DCSA) · Checked 14 September 2026
- What are shipping instructions?Maersk · Checked 14 September 2026
- Shipping instructions — Mandatory information checklistMaersk · Checked 14 September 2026
- Deadline for submitting shipping instructionsMaersk · Checked 14 September 2026
- How to Submit Shipping Instructions on Maersk.comMaersk · Published 17 January 2024; checked 14 September 2026
- What are Shipping Instructions? A Comprehensive GuideHapag-Lloyd · Published 24 October 2024; checked 14 September 2026
- Verification of the Gross Mass of a Packed ContainerInternational Maritime Organization (IMO) · Checked 14 September 2026